Slide 25 of 35
Notes:
Wastewater management system
These pictures were taken in August of 1997 of the temporary wastewater pipes carrying water from Glacier Point to the dispersal area above the 1996 Happy Isles rockslide source area.
Note the water leaking (approximately 3 gallons/minute) in the left picture and the disconnected end in the bottom picture.