THEATRE 101                                   STAGECRAFT I

Fall 2005

 

Instructors:                  Mr. Lefko        &         Ms. Weinzapfel

Office:                         248 PT                                    174 PT

Phone:                         831-5012                     831-5705

Email:                          clefko@radford.edu    mweinzap@radford.edu

Office Hours:              BY APPOINTMENT ONLY

 

Text:  Scene Design and Stage Lighting by Parker and Wolf

 

ATTENDANCE:

You are required to attend all classes.  Role will be taken each class period.  You are given three (3) cuts.  You will loose 5% for each cut over three (3).  A grade of ÒFÓ will be assigned after seven (7) cuts.  THERE ARE NO EXCUSED ABSENCES.  All athletes must submit documentation of away games prior to the game.

 

REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

GRADES:

                        #1        Terms (Scenic & costume)

                        #2        Iso./oblique drawing

                        #3        Floor plan

                        #4        Costume machine sampler

                        #5        Hand sewing sampler

                        #6        Apron/petticoat final

 

STUDENTS W/ DISABILITIES:

If you are seeking classroom accommodations under the Americans with Disabilities Act, you are required to register with the Disability Resource Office (DRO).  The DRO is located in RM 32, Tyler Hall.  Phone is 831-6350.  To receive academic accommodations for this class, please obtain the proper DRO forms.

 

UNIVERSITY HONOR STATEMENT:

By accepting admission to RU, each student makes a commitment to understand support, and abide by the University Honor Code without compromise or exception.  Violations of academic integrity will not be tolerated.  This class will be conducted in strict observance of the Honor Code.  Refer to your Student Handbook for details.

 

 

 

 


STAGECRAFT SYLLABUS

Fall Ô 05

 

Week #1         Group A&B  

Tour – The stage and its equipment

Safety (fire extinguisher) – power tools

                        Power tools

 

Week #2         Group A                                                         Group B

Hand tools - Safety Chart Due                     Intro to costume shop

                        Hand tools                                                       Sewing terms

                        Flats                                                                Equipment      

 

Week #3         Group A                                                         Group B

            Class Proj – (build a flat)                                Cut sampler squares

                        Hardware                                                        Begin machine skills sampler

 

Week #4         Group A                                                         Group B

            Building materials: wood/plastic/metal-           Machine skills sampler work

                        Review terms                                                  Complete sampler

                        Construction of 2D scenery

                        Terms Due

 

Week #5         Group A                                                         Group B

            Construction of 2D scenery                            Begin basic hand skills sampler

                        Rigging (Hanging)                                          Complete sampler

                        Handling flats

                        Sept. 23 – NO CLASS – USITT MASTER CLASSES

 

Week #6         Group A                                                         Group B                                

Scene painting –techniques                             Final proj lay out:

Construction of 3D scenery                            Construct/complete proj

                        MIDTERM                                                    Turn in sewing terms list

 

Week #7         Group B                                                         Group A

Hand tools - Safety Chart Due                     Intro to costume shop

                        Hand tools                                                       Sewing terms

                        Flats                                                                Equipment      

 

Week #8         Group B                                                         Group A

            Class Proj – (build a flat)                                Cut sampler squares

                        Hardware                                                        Begin machine skills sampler

 

Week #9         Group B                                                         Group A

            Building materials: wood/plastic/metal            Machine skills sampler work

                        Review terms                                                  Complete sampler

                        Construction of 2D scenery

                        Terms Due

 

Week #10       Group B                                                         Group A

            Construction of 2D scenery                            Begin basic hand skills sampler

                        Rigging (Hanging)                                          Complete sampler

                        Handling flats

                        Sept. 23 – NO CLASS – USITT MASTER CLASSES

 

Week #11       Group B                                                         Group A                                

Scene painting –techniques                             Final proj lay out:

Construction of 3D scenery                            Construct/complete proj

                        MIDTERM                                                    Turn in sewing terms list

 

Week #12       GROUPS A & B

                        Drafting (Iso. And Obl.)

                        Floor plans

Nov. 11 – LDI

 

Week #13       Drafting/Designing

                        Proj. #1 – 2 Iso/Obl. Due

Nov. 19 – 27:  THANKSGIVING BREAK

 

Week #14       Scene painting – lab

                        Rigging and joining

                        Construction of 3D scenery

                        (Proj. #3 Floor Plan Due)    

 

Week #15       Construction of 3D scenery

                        Metal

                        Stage properties

Dec. 7: Wind and the Willows – STRIKE AT 2:00P

 

FINAL EXAM DATE:  Wednesday, December 14th – 2:00P